1004.1.2 - Occupancy Loading for Residence Halls |
Building |
2018 |
|
1004.1.2 - Reduced Occupant Loading |
Building |
2018 |
|
1006.3 - Motion Detector Switched Means of Egress Emergency Illumination |
Building |
2012 |
|
1007.1.1 - Measuring Remote Exits from Office Suites |
Building |
2018 |
|
1007.7 - Exterior Area for Assisted Rescue Separation Requirement |
Building |
2012 |
|
1008.1.4.3 - Horizontal Sliding Doors |
Building |
2012 |
|
1008.1.4.4 - Access Control Egress Doors |
Fire Prevention |
2012 |
|
1008.1.9.5 - Lockdown Hardware Operation |
Building |
2012 |
|
1008.3 - Motion Detector Switched Means of Egress Emergency Illumination |
Building |
2018 |
|
1009.12 - Guardrails and Handrails on Stairs |
Building |
2012 |
|
1009.13.1 - Roof Access Opening for 3-Story or Less Building |
Building |
2012 |
|
1009.6.3 - Vertical Exit Enclosures in a Mixed Occupancy Building |
Building |
2012 |
|
101 - Enforceability of the North Carolina Energy Conservation Code |
Energy Conservation |
2012 |
|
101.2 - Public Utility Buildings |
Administrative |
2018 |
|
101.2 - Senate Bill 131 Impact to the Application of the 2012 NC Energy Conservation Code |
Energy Conservation |
2012 |
|
101.4.3 - Energy Requirements - HeatingCooling Existing Screened and Enclosed Porches and Dec |
Energy Conservation |
2012 |
|
101.4.3 - Energy Requirements - Reroofing |
Energy Conservation |
2012 |
|
101.4.3 - House Bill 201 Impact to the Application of the 2012 NC Energy Conservation Code |
Energy Conservation |
2012 |
|
101.4.4 - Change in Occupancy or Use |
Energy Conservation |
2012 |
|
101.4.6 - Energy Requirements For Mixed Occupancy Buildings |
Energy Conservation |
2012 |
|
101.5.2 - Building Thermal Envelope Requirements for Conditioned versus Unconditioned Space |
Energy Conservation |
2012 |
|
101.5.2 - Thermal Envelope Requirements for School Stadium Concession Stands |
Energy Conservation |
2012 |
|
1010.1.4.3 - Horizontal Sliding Doors |
Building |
2018 |
|
1010.1.9.5 - Lockdown Hardware Operation |
Building |
2018 |
|
1010.1.9.5 - Lockdown Hardware Operation |
Existing Buildings |
2018 |
|