1010.1.9.5 - Lockdown Hardware Operation |
Fire Prevention |
2018 |
|
1011.11 - Guardrails and Handrails on Stairs |
Building |
2018 |
|
1011.12.2 - Roof Access Opening for 3-Story or Less Building |
Building |
2018 |
|
1012.2 - Change of Occupancy - Residential |
Existing Buildings |
2015 |
|
1012.2 - Change of Occupancy - Residential |
Existing Buildings |
2018 |
|
1013 - Guardrails and Handrails on Stairs |
Building |
2012 |
|
1015 - Guardrails and Handrails on Stairs |
Building |
2018 |
|
1015.2.1 - Measuring Remote Exits from Office Suites |
Building |
2012 |
|
1018.1 - Floor-Ceiling Rating Requirement |
Building |
2012 |
|
1018.1 - Rated Corridor in Day Care of Educational Occupancy |
Building |
2012 |
|
1018.1 - Table 1018.1 Footnote F |
Building |
2012 |
|
1018.6 - Corridor Continuity at Toilet Rooms |
Building |
2012 |
|
1020.1 - Floor-Ceiling Rating Requirement |
Building |
2018 |
|
1020.1 - Rated Corridor in Day Care of Educational Occupancy |
Building |
2018 |
|
1020.1 - Table 1020.1 Footnote F |
Building |
2018 |
|
1022.1 - Exit Stair Enclosures |
Building |
2012 |
|
1022.1 - Vertical Exit Enclosures in a Mixed Occupancy Building |
Building |
2012 |
|
1022.4 - Electrical Outlet Penetrations of Rated Exit Enclosure Membranes |
Building |
2012 |
|
1023.1 - Exit Stair Enclosures |
Building |
2018 |
|
1023.5 - Electrical Outlet Penetrations of Rated Exit Enclosure Membranes |
Building |
2018 |
|
1028 - Means of Egress Related to Bleacher Seats |
Building |
2012 |
|
1029.1 - Emergency Escape and Rescue Opening Requirements for Church Classrooms |
Building |
2012 |
|
1030.1 - Emergency Escape and Rescue Opening Requirements for Church Classrooms |
Building |
2018 |
|
104.1.2 - Plan Review by Contract Consultants |
Administrative |
2018 |
|
104.1.2 - Plan Review by Contract Consultants (1) |
Administrative |
2012 |
|